APPENDIX B

GROUND POLE INSTALLATION (1.2m System)

1.2m Antenna Survival Windloads at 125 MPH Velocity

2.88" or

3.00" O.D.

2.88" or

3.00" O.D.

FH

40.9" HEIGHT (1039 mm)

MT

 

 

IS

 

X

 

A

 

 

M

 

EA

 

B

 

 

16.97o

 

 

OFFSET

MECHANICAL AXIS

 

(NORMAL TO ANTENNA FACE)

FH = Horizontal Force

FV = Vertical Force

MT = Torsional Moment

L

ANT

 

C

 

 

1" to 2"

40.9"

35.8"

SLOPE FOR

 

 

 

WATER RUN OFF

 

72"

GRADE

 

 

 

 

40"

 

#3 REBAR x

 

 

DIA. OF PIER

 

d

 

 

 

 

INSERT THRU HOLE

 

 

 

BELOW

 

 

 

 

 

MIN.

 

 

 

IN TUBE & CENTER

 

 

 

FROST LINE

 

 

 

 

 

 

 

 

 

 

DIA.

 

 

 

 

 

1" to 2"

 

 

35.8"

 

 

 

 

SLOPE FOR

NOTE:

 

 

 

 

WATER RUN OFF

 

 

 

72"

 

 

 

 

GRADE

50" depth may be

 

 

 

 

 

 

 

 

 

 

 

 

 

increased,

 

 

 

concrete and

 

 

 

length of rebar

 

 

50"

will increase

 

(SEE

accordingly.

 

NOTE)

 

 

 

2"

 

#3 REBAR x DIA. OF PIER, INSERT

 

APPROX.

THRU HOLE IN TUBE & CENTER

 

 

 

(4)#3x24"MIN.

d

 

 

AT 90o APART

2"

 

MIN.

 

(SEE NOTE)

 

 

DIA.

 

 

 

 

 

 

 

BELOW

FROST LINE

MO = Overturning Moment

PIER FOUNDATIONS

DEEP FROST LINE FOUNDATIONS

Exposure “B”

Exposure “C”

Exposure “B”

Exposure “C”

FV MO

ELEVATION DEGREES

 

FORCE (POUNDS)

 

MOMENTS (FT-LBS/N-m)

MECHANICAL

BEAM

 

F

F

 

M

M

 

 

 

 

 

 

 

 

 

 

GROUND

ANT

WIND VEL.

DIM “d”

CONC VOL.

DIM “d”

CONC VOL.

DIM “d’

CONC VOL. DIM “d”

CONC VOL.

POLE

 

80 MPH

8”

1.3

13”

3.4

8”

1.6

10”

2.5

“A” or

 

90 MPH

10”

2.0

16”

5.1

8”

1.6

12”

3.6

“B”

1.2M

100 MPH

12”

2.9

18”

6.5

8”

1.6

13”

4.2

“B” or

LFL

110 MPH

14”

3.9

21”

8.8

10”

2.5

16”

6.4

“C”

 

125 MPH

17”

5.8

24”

11.5

12”

3.6

19”

9.0

“D”

 

 

 

 

 

 

 

 

 

 

 

 

 

H

 

V

 

T

 

O

0

17

1285

-35

500

4,380

10

27

1217

-257

488

4,148

20

37

1182

-497

464

4,029

30

47

1071

-711

421

3,650

40

57

943

-857

357

3,214

50

67

822

-943

299

2,802

60

77

686

-985

232

2,338

70

87

515

-762

178

2,096

Mo Based on 40.9" (1039 mm) from Mounting Surface of Center Line of Antenna

Values shown represent maximum forces for any wind direction and include 1.5 Fs. Height and exposure factors from uniform building code are NOT included.

POLE SPECIFICATIONS:

Ground Pole “A” = 2.88 O.D. x .154 Wall (Sch 40) x 72” ASTM A53 or A501 Pipe Ground Pole “B” = 3.00 O.D. x 9 Ga. (.148 Wall) x 72” Steel - CM PN 611685101

Ground Pole “C” = 2.88 O.D. x 2.88 O.D. x .276 Wall (Sch 80) x 72” Steel ASTM A53 or A501 Pipe Ground Pole “D” = 3.00 O.D. x .250 Wall x 72” Steel ASTM 120 Mech Tubing

NOTE:

Pole “B” is supplied from factory powder painted and with hole for #3 rebar and grounding screw.

Poles “A”, “C” and “D” are not supplied and must be field drilled ⁵⁄₈” dia. for #3 rebar and drilled .218

for ¹⁄₄-20 self tapping grounding screw and galvanized or painted for protection.

1 - Pole and foundation design based on the following criteria:

a)Uniform building code exposure B or C and 1.5 stability factor.

b)Vertical soil pressure of 2000 pounds per square foot.

c)Lateral soil pressure of 400 pounds per square foot.

d)Concrete compressive strength of 2500 pounds per square inch in 28 days.

Ground Pole

Must Be

Vertical In

All Directions

Within .19 Inches

At Top (0.3ß)

Bubble

Level

2 - CAUTION - The foundation design shown does not represent an appropriate design for any specific locality since soil conditions vary and may not meet design criteria given in Note 1. You should consult a local professional engineer to determine your soil conditions and appropriate foundation.

13

4

Page 5
Image 5
Andrew 123, 960 manual Appendix B