Wiring

Grounding

1.Install and interconnect ground rods appropriate for proper grounding according to local electrical code requirements.

2.Route ground wires from the ground system into the bus bar located on the enclosure.

Connecting Utility Power to the Enclosure

EP3

(EP6 has additional battery tray)

Tamper Switch

Present on all Models

Site for Power Supply

Battery Tray

Electrical Input Output Box

Maintenance Bypass Switch

Auxiliary Power

Supply Connection

1.Unlock and open the door of the enclosure.

2.Ensure that the utility power switch is OFF.

3.Install a high magnetic circuit breaker box

EP0

Status Monitoring Lamp

Present on all Models

Grounding Wire

Output Connection to Coax

Optional External AC

Generator Interface

To CTSP Utility

Output Terminals

Output Voltage Sensor

4.Using appropriate conduit connectors, run wires from the utility breaker box to the receptacle box inside the enclosure.

5.Connect the wires to the receptacle and install it in the enclosure.

6.Refer to the CTSP-EM User’s Manual for detailed installation instructions regarding the Interface Harness connections.

5

Page 7
Image 7
APC CTEP0-120 user manual Wiring, EP3