Installation

C3/C3BLK installation consists of the following steps:

1.Make connections

2.Apply power

Make Connections

Prior to connecting equipment to the C3 Power Filter, ensure the unit is functioning by connecting the AC Power Cord (provided) on the side panel,

shown as 4 , in Figure 4. When power is applied to the unit, and the unit is powered on, the front panel LEDs will illuminate. Turn the power switch off, and all LEDs extinguish.

Note: Due to the unique filtering and surge protection provided by the C3, APC recommends connecting AV components to the appropriate “labeled” connectors shown on the unit’s outlet panel, and in Figure 3.

Apply Power

Apply power to the C3 by pressing the front panel power switch in (shown as

3, in Figure 2), and then releasing the switch. Once power is applied to the unit, the front panel LEDs will illuminate.

FCC Compliance Information

This device complies with Part 68 and Part 15 of the Federal Communications Commission (FCC) rules. Operation is subject to the following two conditions: (1) This device must not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. As required, the bottom of this equipment contains, among other information, the Registration Number and Ringer Equivalence Number (REN) for this equipment. If requested, this information must be provided to the telephone company.

- 8 -

Page 14
Image 14
APC Model C3 and C3BLK user manual Installation, Make Connections, Apply Power, FCC Compliance Information