APC URTA48XLBPJ, RT SURTA48XLBP user manual Tower Installation

Models: URTA48XLBPJ RT SURTA48XLBP

1 12
Download 12 pages 25.93 Kb
Page 3
Image 3
Tower Installation

Tower Installation

Tower Installation

Caution

Note

When installing the UPS and battery pack(s) as a tower configuration, they must be joined together with stabilizing feet and clips. Failure to comply to this instruction may result in bodily injury or equipment damage.

When installing the UPS and battery pack(s) as a tower configuration, battery pack(s) must be installed to the right of the UPS when facing the front of the UPS. Failure to follow this instruction could result in cabling shortage.

1.Complete this step if this is a new installation of the UPS with battery pack(s).

a.Place the UPS on its side to remove the battery. To remove the battery, refer to the “Battery Replacement Instructions” procedure in the UPS user manual.

b.Remove the stabilizing feet and top cover . Retain removed components for reuse.

 

x2

x2

 

c. Join the equipment together as shown.

Assemble the stabilizing feet and foot extensions .

Place the UPS on top of the battery pack.

Attach the stabilizing feet , clips , and top covers .

x2

x2

x4

 

 

 

 

 

 

 

d. Place the equipment in an upright position.

Smart-UPS RT SURTA48XLBP/SURTA48XLBPJ External Battery Pack User Manual

3

Page 3
Image 3
APC URTA48XLBPJ, RT SURTA48XLBP user manual Tower Installation