INSTALLATION INSTRUCTIONS
electrical installation (continued):
breaker panel
15 AMP
2 POLE
GFCI BREAKER
15AMP
1POLE
GFCI BREAKER
HEATER | MAIN |
RED |
|
WHITE |
|
BLACK |
|
GROUND |
|
WHITE |
|
BLACK |
|
GROUND |
|
BLOWER |
Bonding wire: Connect a #8 bare copper bonding wire from the pump motor to the heater and then to the cold water plumbing or other suitable ground. Grounding is required. Grounding is NOT required for the blower.
12 | Aquatic Industries, Inc. |