INSTALLATIONINSTRUCTIONS
InstallationProcedures for integrallyskirted modelS:
1.To avoid obstructions during installation, make sure water lines, spout pipes and valve plumbing do not project into alcove.
2.Ledger Strip: Fasten a 1” x 3” (25mm x 75 mm) ledger strip along rear for alcove and along both sides in corner installations at Dimension LH. (see Diagram 3A)
3.Place three or four mounds of mortar away from drain hole in a line or square, approximately twice as high as the cavity under the tub bottom.
4.Place tub into alcove with front skirt firmly on floor and depress mortar mounds. Make certain that back ledge of tub rests firmly on ledger strip. (see Diagram 3A)
5.See and follow Sealing & Finishing Diagram 3B.
3A | 3B |
Removable Skirt Panels for IntegrallySkirted ModelS:
These models are offered with removable panels. It provides a
Important: Before installation of the panel, fill the unit, test the whirlpool system for proper operation and check for leaks, then drain.
| Framing |
Integrally Skirted Acrylic Whirlpool | Dry Wall |
|
Right Side Edge
Clips
(back of panel)
Panel
4A | Left Side Edge |
|
Aquatic Industries, Inc. | 9 |