Ariston 41-116-05 Table Of Contents, General Information, Installation, Commissioning

Models: 41-116-05

1 20
Download 20 pages 25.86 Kb
Page 2
Image 2
TABLE OF CONTENTS

TABLE OF CONTENTS

1.GENERAL INFORMATION

1.GENERAL INFORMATION

1.1GENERAL INSTRUCTIONS

1.2OVERALL VIEW

2.INSTALLATION

2.1REFERENCE STANDARDS

2.2SITING THE APPLIANCE

2.3OVERALL DIMENSIONS

2.4CLEARANCES

2.5MOUNTING THE APPLIANCE

2.6ELECTRICAL CONNECTION

2.7GAS CONNECTION

2.8WATER CONNECTIONS

2.9FLUE CONNECTION

2.10ROOM THERMOSTAT CONNECTION

2.11ELECTRICAL DIAGRAMS

2.12GAS AND WATER CIRCUITS

3.D.H.W. STORAGE CYLINDER

3.12 PORT AND 3 PORT VALVE INSTALLATIONS

3.2DOMESTIC HOT WATER PRIORITY KIT

4.COMMISSIONING

4.1INITIAL PREPARATION

4.2CONTROL PANEL

4.3REMOVING THE FRONT PANEL

4.4INITIAL START UP

4.5OPERATIONAL ADJUSTMENTS

4.6COMBUSTION ANALYSIS

4.7FUME DISCHARGE MONITORING

4.8DRAINING THE SYSTEM

5.GAS ADJUSTMENTS

GAS ADJUSTMENT TABLE

5.1CHANGING THE TYPE OF GAS

6.MAINTENANCE

7.TECHNICAL INFORMATION

This manual is an integral and essential part of the product. It should be kept with the appliance so that it can be consulted by the user and our authorised personnel.

Please carefully read the instructions and notices about the unit contained in this manual, as they provide important information regarding the safe installation, use and maintenance of the product.

For operating instructions please consult the separate User’s Manual.

2

Page 2
Image 2
Ariston 41-116-05 Table Of Contents, General Information, Installation, 3. D.H.W. STORAGE CYLINDER, Commissioning