Ariston 41-116-05 installation instructions

Models: 41-116-05

1 20
Download 20 pages 25.86 Kb
Page 6
Image 6
Manual background

FIG. 2.2

N

L

E

The boiler operates with alternating current, as indicated in the technical information table in section 7, where the maximum absorbed power is also indicated. Make sure that the connections for the neutral and live wires correspond to the indications in the diagram. The appliance electrical connections are situated on the reverse of the control panel under the inspection cover (see the servicing manual for further information)

 

 

IMPORTANT!

 

 

 

In the event that the power supply cord must be changed, replace it with one with the

 

 

same specifications. Make the connections to the terminal board located within the

 

 

control panel, as follows:

 

 

 

- The yellow-green wire should be connected to the terminal marked with the

 

 

symbol;

 

 

 

- The blue wire should be connected to the terminal marked “N”;

 

 

 

- The brown wire should be connected to the terminal marked “L”.

 

 

 

Note: The diagrams for the electrical system are indicated in section 2.12.

 

 

 

Warning, this appliance must be earthed.

 

 

 

External wiring to the appliance must be carried out by a competent person and be

 

 

in accordance with the current I.E.E. Regulations and applicable local regulations.

 

 

The microSYSTEM range of boilers are supplied for connection to a 230 V~

50 Hz

 

 

supply.

 

 

 

The supply must be fused at 3 A.

 

 

 

The method of connection to the electricity supply must facilitate complete electrical

 

 

isolation of the appliance, by the use of a fused double pole isolator having a contact

 

 

separation of at least 3 mm in all poles or alternatively, by means of a 3 A fused

 

 

three pin plug and unswitched shuttered socket outlet both complying with BS 1363.

 

 

The point of connection to the Electricity supply must be readily accessible and

 

 

adjacent to the appliance unless the appliance is installed in a bathroom when this

 

 

must be sited outside the bathroom (see section 2.2).

 

2.7

GAS CONNECTION

The local gas region contractor connects the gas meter to the service pipe.

 

 

 

If the gas supply for the boiler serves other appliances ensure that an adequate

supply is available both to the boiler and the other appliances when they are in use at the same time.

Pipe work must be of an adequate size. Pipes of a smaller size than the boiler inlet connection should not be used.

2.8WATER CONNECTIONS

FIG. 2.4

LEGEND:

A = Central Heating Flow

C = Gas Inlet

E= Central Heating Return

F= Safety Valve

G= Pump transportation screw (remove before igniting the boiler)

H= Automatic By-pass pipe

VIEW OF THE BOILER CONNECTIONS

 

 

 

E

 

D

 

 

 

A

 

B

C

 

 

 

F

 

 

 

FIG. 2.3

 

 

SC004A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

Page 6
Image 6
Ariston 41-116-05 installation instructions