4.After all units have had stacking enabled, connect the console to the first unit (the Master unit).
5.Power cycle the whole stack, or, if the units are to be powered up separately, power the Master last.
6.Go to the Master’s Stack Management menu and type s to be- gin the automatic formation of the stack.
7.After the stack is formed, configuration and operation of the stack can begin (see the User’s Manual for information on con- figuring the switch(es) for operation.).
20 | Getting Started Guide |
|