Associated Equipment 2HP, 3HP specifications Operation, Assembly, lnstallation

Models: 2HP 3HP

1 8
Download 8 pages 59.31 Kb
Page 2
Image 2
Assembly

OoeratinolnstruclionsandPartsIVanual

Assembly

%, % and % Models (See Flgure 1, Page 4)

1.Assemblyincludeslhe lnslallationoi the a r ballle, sealng gaskel,dischargebag elbow,dust bag, hose and nozzle.

2.To installthe air bafileirnd sealinggaskel,placeihe unit upsidedown on a cardboardcoveredtlal area.

a.Atiach lhe air balfle(13) as shown usingincludedbots.

b.Removethe paper protectionfrom the siickys de of the gaskel(12) and installon lhe undersideof drum ld/guard assembly{11).Sudaceshouldbe clean and dry belofe

3.Attachbag elbow,filier bag, hose and nozzle.

a.Placethe unil right-sideup on yoLrrcontaner and attach the dischargebag elbow (4) on the dischargeol lhe bloweras shownin lhe illuslrationInsert.and lightenlhe includedsheet rnetalscrews.

b.CLampthe dust bag (9) on the other end of lhe elbow usingthe clamp enclosed(6).

c.I\lo!nt sheel melal reducingadapler(10)to lhe inlel on iop ol drum lid/guardassernblyusinglhe squeezelug lo secure.(x HP [4odelon]y).

d.Clamp suclionhose (7)10 reducingadapteror inletwth adjustableclarnp(8) provided.

e.Clamp nozzle(14)to suctionhosewilh camp (8).

'1,(See

1x, 2 and 3HP Models Figure 2, Page 5)

1.Assembly ncludesthe insrallationol lhe intakecylinder, deflectorelbow,sealinggaskel,dischargebag elbow,dusl bag, hose and nozzle.

2.To insiallthe intakecylinder,delleclorelbowand sealing gaskel,placelhe unit upsidedo\,!non a cardboardcovered

a.The delleclore bow (98) is allachedas shownby rcmovingthe two nuts nslalledal lhe laclory,

b.The nrakecyLinde'{13) is dhaLhedas shownLsirg 1/4-20bolls supplied.

c.Bemovelhe paper proieciionfrom the slickyside of the sealinggaskel(11) and installon lhe undersde of lhe drumlld (10) .

3.Allach bag elbow,I lter bag, hose and nozzle(excepl 3HP lVodel)'.

a.Placethe unit right-slde-upon your containerand atlach lhe discharcebag elbow (3A)on lhe dischargeof lhe bower as shownin the illustration.Inserland ilghlenihe lncludedsheel melal screws.

b.The dusl bag s atlachedlo lhe rernovableelbowsleeve (3C).(Thissleeves ips overlhe end of the elbow and is held in placewilh snap'atches.Clarnp)lhe dusl bag (8) to lhe sleev€(3C) usinglhe clamp (14)enclosed.

IMPORTANT!Theedge of lhe dust bag shouldbe approxirnately1/4'belowlhe flangeon lhe seeve so that the snap-lalchescan closecomplelely.lt lhe iabrlc is too close to the flange,the snap-latchwill reston ihe iabric, and not fully rerainrhe dusl bag.

Slipth€ 6 diamelerO-ring(38) overthe end of the elbow (3A)and seat againsllhe retainrng b.Wilh snap latchesln a aised posilion,slidethe sleeve(3C)wilh attachedbag onlo the end of the elbowwlh a slight lwisling morionunliltghl aga nsl lhe oling. snap the latchesdown.(Toremovelhe dusl bag lor ernptying, snap up lhe lalchesand removeihe seeve;reinstalas

c.l,lounllhe sheel meial reducng adapler(7) on the inlet elbow (9A) usingrhe squeezelug to secure. (1HPN4odelonly) .

d.Clamp lhe suclionhose i5) to the reducingadapleror nletelbow usingthe adjustableclamp (6) provided.

e.Clamp nozzle(12)to suclionhose wllh clamp (6).

lnstallation

Pacelhe assembleddusicollectoronrhecorrectdiameter drum(notincluded)Plastic.conlainersshouldnol be used as lhey cannotsupportth€ weightol lhe colleclor.

Pace X,l, andt1HP Modelsona conlainerhavinga diameter ol 19[''201'-Thisincludes3o-gallongalvanizedgarbage cans,or 30 35 gallonopeniop sieelor liberdrums.Donol use

Place1, 114,2 and3 HP Modelsona conlainerhavinga diameter€nge of 23"24',suchas a standard55-gallonsle€l or liberdrum.Donotuseplasticdrums.

Checkmotorrotationon3-phasepowerconnections;lhe coolinglan onthe molorshouldtum clockwrseasobserved ifomaboveAn. electriciancancoffectrolanonb? interchanginganytwo(3-phase)powerleadwlres.

Operation

Attachihe dusicollectorinlelhosedireclyto ihe conneclor builtinlothedustproducinglool.lf nobuilt-n conneclor, posliona hoseendmounlednozzlewheret wil collecllhe dusl.NOTE:Checklhe recommendaionof lheloo manufaclurerforthe requiredCF[,4airllowTheCFMlisledin lhe specificationslor yourcollectorshouldbe greaterthanthe requiredCFI!'ltoensureduslcollection,Seepage7.

Emptytheduslcollectiondrumwhenit becomeshaf fult if too lull,alldlst wl I becarriedintothedustbag.

'Seepage6lor liler bagattachmentfor3HPlvodel.

Page 2
Image 2
Associated Equipment 2HP, 3HP specifications Operation, Assembly, lnstallation