ENGLISH

3.4 Power On

NetMaster G16/24 Gigabit Ethernet Switch is powered by AC power supply. Powering on the Switch, it will automatically initialize and its LED indicators should respond as follows:

1.All of the Link/Act and 1000Mbps LED indicators will flash momentarily for one

2.second, which represent a resetting of the system.

3.The Power indicator will light up.

4.The FAN LED indicators will light up.

If the LED indicators don't respond as described above, please check the power supply and connection.

3.5 Front Panel

The front panel of the NetMaster G16/24 consists of switch LED indicators, 16/24 10/100/1000Mbps RJ-45 ports.

LED

 

MEANING

 

 

 

This indicator will light solid red when the Switch

 

Power

 

powers up.

 

 

If theLED is not lit, please check the power supply and

 

 

 

 

 

 

connection.

 

 

 

This indicator will light solid green when the

 

FAN (1-2)

 

corresponding cooling fan works properly. NetMaster

 

 

G24 has two FAN LEDs. FAN1 indicates the fan at the

 

 

 

 

 

 

right-hand side and FAN2 indicates the fan on the rear

 

 

 

panel. NetMaster G16 has one FAN LED.

 

 

 

This indicator will light solid green when the

 

Link/ACT

 

corresponding port is connected to another device and

 

 

will flash green when data is being transmitted or

 

 

 

 

 

 

received on the working connection.

 

 

22