PROCEDURE FOR HORIZONTAL INSTALLATION
⃞Attach bracket (L) and bracket (R) to each side of the unit,using the hexagonal bolts with washer base (M5 x 10).
PROCEDURE FOR VERTICAL INSTALLATION
NOTE: If the
Bracket (L)
NOTE: Use seals (A) to cover unused | Bracket (R) |
Hexagonal bolt | |
mounting holes on sides of unit. | with washer base (M5 x 10) |
⃞Determine the mounting location, and drill four mounting holes.
Never mount the unit near the fuel tank.
Drill holes 4mm in diameter. | |
⃞ Secure the unit in place,using four | |
screws(T5x12). | (T5 x 12) |
Use RTV(sillicone sealer)on screw threads or around the holes to prevent moisture intrusion.
Bracket (L)
Bracket (R)
⃞Set the 4
position “v”
⃞Determine the mounting location, and drill four mounting holes.
Drill holes 4mm in diameter.
⃞Attach bracket (L) and bracket (R) to each side of the unit, using the hexagonal bolts with washer base (M5 x 10).
NOTE: Use seals(A) to cover unused mounting holes on sides of unit.
Bracket (L)
Bracket (R)
Hexagonal bolt with washer base (M5 x 10)
⃞Mount the unit in place, using four
Bracket (L)
Bracket (R)
6 |
| 7 |
|
|
|