4)Once the mounting location of the monitor has been determined, there may be additional preparation work necessary, depending on the vehicle structure and installation method. Some of the steps that may be required are:
A)Removal of the vehicle's dome light
B)If the trim ring will be used, it may have to be trimmed to fit the contour of the vehicle's headliner. Refer to the "Trim Ring Installation" section in this manual.
TRIM RING INSTALLATION:
Note: This page only covers special installation considerations for thick trim ring installation. If the video monitor is to be installed in a vehicle with the thick trim ring, it may need to be trimmed to fit the contour of the vehicle Head liner.
Note: The trim rings supplied with this unit are not designed to be trimmed.
1)In this installation, the video monitor is mounted directly to the overhead
The trim ring is attached to the video monitor using the perimeter screw bosses. It is important that the screws used in this installation are not over tightened, and that the video monitor and trim ring are mounted in such a way that the assembly does not distort (or bend) when the mounting screws are tightened. An alternate method is to use the mounting bracket. First secure the mounting bracket to the
2)It is best to mount the video monitor to the roof structure without the trim ring first. There should be a gap between the headliner and the outer flange of the video monitor. The trim ring should be cut to fill this gap. Apply masking tape to the outer surface of the trim ring in the areas where the cut will be made.
3)Mark the cut to follow the necessary contour of the roof. The suggested method of marking is as follows:
A)First mark the narrowest point of the trim ring on the masking tape. Be careful to consider not only vertical location, but
B)Using the handle of a screwdriver, make a "transfer marking tool". See diagram below. Place the tool against the roof and the marker against the masking tape on the trim ring. Trace the cut to be made around the entire perimeter of the trim ring.
C)Cut the trim ring using a sharp utility knife or shears. Make the cut in several passes over the marked line, each time cutting a little deeper. It is not necessary to cut completely through the plastic, the cut only need be over 50% of the wall thickness of the plastic. By bending the cut back and forth several times, the plastic will break cleanly at the cut.
D)Check the fit of the trimmed console and make any minor adjustments necessary.
4)The trim ring can be painted or covered with a material that matches the head liner before assembling the trim ring to video monitor.
5)The finished trim ring should be attached to the video monitor, then attach the assembly to
the roof.
Headliner
Cut line
Lowest point mark
Tape marker to screwdriver. Starting at your mark for the
lowest point, trace the contour of the roof
7