Installation Instructions
Install a 1/2” male threaded pipe fitting, recessed 3/8” behind the surface of the finished wall. Wrap the threads with Teflon tape.
Place the sealing gasket and escutcheon against the wall. Screw the spray body through the escutcheon and gasket, and onto the male pipe fitting. If the pipe fitting is recessed properly, the spray body will hold the escutcheon firmly against the wall.
Screw the base body over the spray body.
Push the sprayhead firmly over the spray body.