Manuals
/
Bakers Pride Oven
/
Kitchen Appliance
/
Fryer
Bakers Pride Oven
LGF-FC service manual Gas Pressure Fryer, Replacement Parts
Models:
LGF-F
LGF-FC
LGF
1
34
60
60
Download
60 pages
45.36 Kb
31
32
33
34
35
36
37
38
<
>
Install
Wiring Diagrams
Replacement Parts
Maintenance
8A, B, C, D preset buttons Beeper Display
Assembly #
LGF-F120V/60HZ/1 Phase
Keep The Floor Around Your Fryer Clean Of
Controls and Indicators
How to
Page 34
Image 34
Gas Pressure Fryer
Replacement Parts
Figure 3.
Lid/Arm Assembly, AN3211350S (Sheet 3 of 4)
32
Page 33
Page 35
Page 34
Image 34
Page 33
Page 35
Contents
Gas Pressure Fryer
Serial Numbers 137733 and higher
REPLACEMENT PARTS
Warranty Information
LIMITED ONE YEAR WARRANTY
FOR YOUR SAFETY
Table of Contents
Table of Contents
Gas Pressure Fryer
Safety Signs and Messages
Safety
Introduction
Equipotential ground plane
Specific Precautions
Full Disconnection
Use Gas Safely--Avoid Danger
Do Not Store Or Use Anything Flammable Near
The Fryer
Beware of High Voltage
Shortening
Keep The Floor Around Your Fryer Clean Of
Keep The Lid Closed When The Fryer Is Not In Use
Keep The Casters Locked
Always Make Sure The Lid Hook Is Latched When
Always Tighten The Spin Handle When Closing
Seal The Safety Valve Properly
Closing The Fryer
Keep this manual with the Equipment
Keep Safety Labels Clean and in Good Condition
Keep Away From The Vent
Protect Children
Know your responsibilities as an Employer
Be Prepared for Emergencies
Do Not Smoke Near The Fryer
Gas Pressure Fryer
Safety Labels
Introduction
Gas Pressure Fryer
Introduction
Installation
Installation
Gas Pressure Fryer
Controls and Indicators
Operation
Item Description
Function
Item Description
8A, B, C, D preset buttons Beeper Display
Function
LGF and LGF-FOperation
Care of the Shortening
Start-UpLGF and LGF-F
DISPLAY
Cooking LGF and LGF-F
MODE DESCRIPTION
11.Slowly open the lid
LGF-FCOperation
System Programming
STEP
Gas Pressure Fryer
Operation
ACTION
Product Programming
COMMENTS
Gas Pressure Fryer
Operation
STEP
COMMENTS
STEP
ACTION
DISPLAY
Start-Up LGF-FC
Cooking LGF-FC
12.Slowly open the lid
Potato Wedges
Recipes
Fried Onion Rings
French Fries
Pork Chops
Whole Turkey 12 to 14 pounds
Whole Duckling
Cube Or Minute Steaks
Operation After Gas or Power Outage
Normal Shutoff
Maintenance
Maintenance
Gas Pressure Fryer
Assemblies
Replacement Parts
Assembly #
Description
Figure 3. Lid/Arm Assembly, AN3211350S Sheet 1 of
Replacement Parts
Gas Pressure Fryer
Figure 3. Lid/Arm Assembly, AN3211350S Sheet 2 of
Replacement Parts
Gas Pressure Fryer
Figure 3. Lid/Arm Assembly, AN3211350S Sheet 3 of
Replacement Parts
Gas Pressure Fryer
Figure 3. Lid/Arm Assembly, AN3211350S Sheet 4 of
Replacement Parts
Gas Pressure Fryer
ITEM #
Replacement Parts
Gas Pressure Fryer
PART #
PART #
ITEM #
DESCRIPTION
Figure 5. Drain/Motor/Piping Assembly
Replacement Parts
Gas Pressure Fryer
Table 5. Drain/Motor/Piping Assembly Parts
Figure 6. Burner Tray Assembly
Replacement Parts
Gas Pressure Fryer
Gas Pressure Fryer
Gas Pressure Fryer
Replacement Parts
Figure 7. Control/Insulation Panel LGF & LGF-F
Table 7. Control/Insulation Panel LGF & LGF-FParts
Gas Pressure Fryer
Replacement Parts
Figure 8. Control/Insulation Panel LGF -FC
Table 8. Control/Insulation Panel LGF -FCParts
DESCRIPTION
ITEM #
PART #
H0010
Figure 10. Oil Vat Assembly AN32112800
Replacement Parts
Gas Pressure Fryer
DESCRIPTION
ITEM #
PART #
F0067
DESCRIPTION
ITEM #
PART #
FT0235
DESCRIPTION
ITEM #
PART #
B0996
Table 14. Drain Valve & Plugs SB1999S Parts
DRAIN VALVE REPLACEMENT
Figure 14. Drain Valve & Plugs SB1999S
ITEM #
Item #
Accessories
Accessory #
Description
Description
Components
Component #
Figure #
Diagram #
Wiring Diagrams
Wiring Diagram
Page #
Figure 17. LGF-F120V/60HZ/1 Phase
Wiring Diagrams
Gas Pressure Fryer
Figure 18. LGF-FC120V/60HZ/1 Phase
Wiring Diagrams
Gas Pressure Fryer
Figure 19. LGF-FC220V/50HZ/1 Phase
Wiring Diagrams
Gas Pressure Fryer
Figure 20. LGF-FC220V/60HZ/1 Phase
Wiring Diagrams
Gas Pressure Fryer
Figure 21. LGF-FC240V/50HZ/1 Phase
Wiring Diagrams
Gas Pressure Fryer