Bard CH4S1, CH5S1, CH3S1 installation instructions Typical Building Outside Sheeting Unit

Models: CH3S1 CH5S1 CH4S1

1 28
Download 28 pages 36.1 Kb
Page 12
Image 12
Typical Building

FIGURE 6

ELECTRIC HEAT CLEARANCE

Typical Building

Outside Sheeting

Unit

Supply Air Duct

Flange of Wall

Wall Frame

Inside Sheeting

Supply Air

Duct

1" OPTIONAL CLEARANCE

RECOMMENDED

Side section view of supply air duct for wall mounted unit showing 0" clearance to combustible surfaces.

MIS-2210

Note: This unit is approved for 0" clearance, but the optional 1" clearance is recommended. See Figures 4 & 5.

Manual

2100-455M

Page

12 of 28

Page 12
Image 12
Bard CH4S1, CH5S1, CH3S1 installation instructions Typical Building Outside Sheeting Unit