Contents
Getting Other Informations and Publications | ........ 1 |
General Instructions |
|
Important | 4 |
Shipping Damage | 4 |
General | 4 |
4 | |
Installation |
|
Location | 6 |
Typical Installations | 6 |
Condensate Drain Trap | 9 |
Air Filters | 9 |
Wiring – Main Power | 10 |
Wiring – 24V Low Voltage Control Circuit | 10 |
Transformer Taps | 10 |
Thermostats | 10 |
Start Up and Operation |
|
Three Phase Scroll Compressor Start Up |
|
Information | 11 |
Sequence of Operation | 11 |
Start Up Notes | 11 |
High Pressure Switch and Lockout Relay | 11 |
Service and Troubleshooting |
|
Service Hints | 12 |
Pressure Service Ports | 12 |
Refrigerant Charge | 12 |
Fan Blade Settings | 12 |
Suction and Discharge Tube Brazing | 12 |
Pressure Table | 13 |
Figures |
|
|
Figure 1 | Prefabricated Rood Curb |
|
| Specifications | 5 |
Figure 2 | Field Fabricated Curbing | 5 |
Figure3 | Elevated Mounting Platforms | 7 |
Figure 4 | Airflow and Service Access |
|
| Clearances | 7 |
Figure 5 | Roof Top Application | 8 |
Figure 6 | Slab Mounting at Ground Level | 8 |
Figure 7 | Condensate Drain Trap | 9 |
Figure 8 | Low Voltage Wiring | 10 |
Figure 9 | Fan Blade Setting Dimensions | 12 |
Figure 10 | Brazing Diagram | 13 |
Tables |
|
|
Table 1 | Electrical Data | 2 |
Table 2 | Optional Field Installed Heater |
|
| Packages | 2 |
Table 3 | Optional Field Installed Heater Table | 3 |
Table 4 | Maximum ESP of Operation | 4 |
Table 5 | Rated CFM and Rated ESP | 6 |
Table 5A | ESP in Inches H2O | 6 |
Table 6 | Air Filter Area and Size | 9 |
Table 7 | Thermostat Wire Size | 10 |
Table 8 | Wall Thermostat and Subbase |
|
| Combinations | 10 |
Table 9 | Refrigerant Charge | 12 |
Table10 | Pressure Table | 13 |