16/24 Port Gigabit PoE PSE With 4 SFP Slots Web Smart Switch
3. Installation
3.1 Hardware and Cable Installation
CAUTION: Wear a grounding device to avoid damage from electrostatic discharge.
Be sure that the power switch is OFF before you connect the power cord to the power source.
3.1.1 TP Port and Cable Installation
1.The switch’s TP ports support
2.Connect one end of a CAT5 grade
3.Repeat the above steps, as needed, for each
The switch is now ready to operate.
3.1.2 Installing Optional SFP Transceiver Module
NOTE: If you do not plan to install SFP fiber transceivers in the switch’s ports
Slide the fiber transceiver module into one of the two open module slots in the switch as shown in Figure
Connecting the SFP Module to the Chassis
The optional SFP modules are
1.Verify that the SFP module is the right model and conforms to the chassis.
3.Slide the module into the slot. Make sure that the module is properly seated against the slot socket/connector.
5.Connect the fiber optic network cable to the connector(s) on the module.
7. If you want to install a second module in the switch, repeat steps
Page 10 |