Horizontal Installation

Confirm that Anti-Vibration Switches on both left and

right sides are set to position H.

Attach bracket (L) and bracket (Ft) using the hexagonal bolts (M5 x 8).

Attach brackets (L) and (R) to their respective brackets (B) using the hexagonal bolts (M6 x 20) and the hexagonal nuts (M6).

 

Pull back the carpet and determine

0

. Remove the hexagonal nuts and

0

where to attach the unit.

take off the changer.

Stick the supplied double-sided tape

 

 

to the bottom of the brackets (B) and

 

 

 

peel off the paper backing.

 

 

Affix the unit to the floor by pressing in place.

A

CD

Using a knife, cut “x”s in the carpet directly above the brackets (6) bolts.

Return the carpet to its original position allowing the bolts to protrude through.

Once more, use the hexagonal nuts to attach the changer on top of the

Q carpet.

8

Page 8
Image 8
Blaupunkt CDC-RF6IR manual Horizontal Installation, Right sides are set to position H, Carpet