Blaupunkt CDC-RF6IR manual Vertical Installation

Models: CDC-RF6IR

1 19
Download 19 pages 48.97 Kb
Page 9
Image 9
Vertical Installation

Vertical Installation

onfinn that Anti-Vibration Switches on both left and right sides are set to position V,

Attach brackets (L) and (R) using the hexagonal bolts (M5 x 8).

Attach brackets (L) and (R) to their respective brackets (B) using the hexagonal bolts (M6 x 20) and the hexagonal nuts (MS).

Pull back the carpet and determine where to attach the unit.

Stick the supplied double-sided tape

to the bottom of the brackets (B) and peel off the paper backing.

Affix the unit to the floor by pressing in place.

Once more, use the hexagonal nuts to attach the changer on top of the

Page 9
Image 9
Blaupunkt CDC-RF6IR manual Vertical Installation