Installation

Ventilation

DIRECT FLUE ARRANGEMENT

When the installation of a mechanically driven ex- haust hood is impractical the oven may be vented by a direct flue arrangement.

WARNING!!

It is essential that the direct flue be installed as follows. Incorrect installation will result in unsatisfactory baking and oven damage.

The flue must be class B or better. The height of the flue should rise 6-8 ft (2-2.5 m) above the roof of the building or any proximate structure. Never direct vent the oven into a hood. The flue should be capped with a UL Listed type vent cap to isolate the unit from external environmental conditions.

The direct vent cannot replace air consumed and vented by the oven. Provisions must be made to supply the room with sufficient make-up air. Total make-up air requirements for each oven section should be approximately 30 CFM (.85 m3) per sec- tion. To increase the supply air entering the room, a ventilation expert should be consulted.

FLUE DIAMETER

Oven

Single

Double

 

 

 

SHO-G

6” (15cm)

6” (15cm)

 

 

 

Installing the draft hood

Ovens ordered for direct venting are supplied with a draft hood. Install the draft hood as follows:

1.Place the draft hood over the flue connector. See Figure 9.

2.Secure both ends with the sheet metal screws provided.

Flue

Draft Hood

Front of

Oven

Figure 9

9

Page 13
Image 13
Blodgett SHO-G manual Direct Flue Arrangement, Flue Diameter, Oven Single Double, 15cm Installing the draft hood