®

Contact 1-800-762-1142 for assistance.

 

Do not return to place of purchase.

Step 2 – Attach Platform to Legs

Line up hole in Clip with small threaded hole on bottom of Platform. Attach Clip loosely to Platform with (1) Large Screw.

Note: Do not tighten until step 9.

Using 13mm wrench, secure Platform to Legs using (2) Large Bolts, (2) Small Lock Washers and (2) Small Nuts per Leg. Tighten fully.

Fully tighten all nuts and bolts from Step 1.

TIP:

To tighten use a 13 mm wrench on Bolt and a 13mm socket wrench on Nut.

Step 3 – Insert Gas Line Through Platform / Attach Cylinder Cover

Insert Gas Line up through large hole in Platform from underneath between center and left leg as shown in illustration.

Slide Shroud Cover over Gas Line, then over Platform/Leg assembly until bottom of Shroud rests on Base.

Note:

The fitting at end of gas line is 3/8 NPT female. Plumbing should be done from this point according to local code.

7

Owner’s manual: model 233010 outdoor patio heater

6/8/04