WARNING: THIS APPLIANCE IS SERVICED AND REPAIRED EXTERNALLY.

EXTERNAL EQUIPMENT OPERATED AT 230V SHOULD NOT BE INSTALLED, SERVICED OR REPAIRED UNDER ADVERSE WEATHER CONDITIONS.

THIS APPLIANCE IS INSTALLED AND SERVICED EXTERNALLY TO THE PROPERTY, BUT THE ENGINEER MUST HAVE ACCESS TO THE INSIDE OF THE PROPERTY WHEN INSTALLING OR SERVICING THE APPLIANCE.

7

C

B

3

45

2

6

 

8

2

E

D

 

7

A

BOILER INSTALLATION

Note: The cabinet is not load bearing it only provides weather protection for the boiler inside.

1Mark position of the 100mm services duct on the exterior wall and make a hole through.

2Remove the key for the door fastners from its transport position in the left hand side panel flue outlet aperture.

Undo the screws at the bottom of

the front panel (using the key provided) and remove the screws from the rear panel pulling both panels out and down to remove. Store safely away from the installation point.

3Remove the screws from the top panel and lift up to remove, store safely away from the installation point.

4Slide the pressure gauge up out of its bracket and carefully rest on top of the heat exchanger taking care not to snag or kink the capillary.

5Remove the screws securing the control box to the side panels and carefully rest the control box on top of the heat exchanger taking care not to snag or kink the capillaries.

6Remove the screws securing the side panels to the base panel and lift the side panels off complete with the rear support bar (shaded grey) and carefully stand the panels away from the installation point.

7Loosen the flexable air duct clamp (A) and remove the air duct from the burner.

Depress the locking ears to unplug the burner lead (B) from the control box (C).

Unscrew the burner retainers (D), then withdraw the burner (E) from the boiler and store safely away from the installation point.

8Remove the screws securing the base panel to the transit pallet and lift the boiler off the pallet and into its installation position taking care not to scrape the base panel across the hard standing. Do not attempt to lift and position the boiler on your own. Do not use the copper pipes to move the boiler.

Fasten the base to the hard standing using the holes provided. Care should be taken to ensure that the base is level.

9Refit the side panels and rear support bar and screw the side panels to the baseplate and boiler.

Refit the control box and pressure gauge taking care not to kink the capillary tubes.

Measure the 100mmØ services duct to give at least 10mm inside the casing and to finish flush with the interior wall surface, cut to size and fit the duct. Fit the 100mm sealing ring where the duct enters the casing and seal the joint to the exterior wall and inside the cabinet with a suitable sealant.

INSTALLATION

20

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32 8 716 113 389b (09/07)

BOILER INSTALLATION

Page 21
Image 21
Bosch Appliances 18/25, 25/32kW, 12/18 instruction manual Boiler Installation

25/32kW, 12/18, 18/25 specifications

Bosch Appliances has carved out a reputation for engineering high-performance heating solutions, particularly with their range of heating systems including the 18/25, 12/18, and 25/32 kW models. These systems are designed to meet the diverse needs of residential and commercial spaces while maintaining energy efficiency and sustainability.

The Bosch 18/25 kW model excels in providing an optimal heating solution for medium to large residential properties. It is equipped with a highly efficient condensing boiler that extracts additional heat from flue gases, achieving significant energy savings. The built-in, user-friendly interface allows for easy programming and monitoring, which maximizes user convenience.

The 12/18 kW model provides a versatile opportunity for smaller homes or apartments. Its compact design ensures that it fits seamlessly into tighter spaces without sacrificing performance. The unit operates quietly, making it an excellent choice for residential areas where noise can be a concern. Additionally, it features the latest modulation technology, optimizing energy usage and maintaining consistent temperatures.

Finally, the 25/32 kW model is ideal for larger installations, offering robust performance even in high-demand scenarios. This model benefits from advanced heating management systems that enable intelligent control of heating zones, ensuring efficiency and comfort throughout the property. With its enhanced energy rating, the 25/32 kW model significantly reduces the carbon footprint, aligning with modern sustainability goals.

Across the board, Bosch Appliances integrates advanced technologies such as intelligent diagnostics, smart home compatibility, and eco-friendly materials. All models are constructed with durability in mind, featuring corrosion-resistant heat exchangers and high-quality components designed for longevity.

The customer-focused features, including comprehensive warranty packages and responsive customer service, further exemplify Bosch's commitment to quality. Overall, Bosch Appliances 18/25, 12/18, and 25/32 kW heating systems stand out for their innovative technology, efficient performance, and reliability, making them an excellent choice for those looking to upgrade their heating solutions.