1
max | max |
flue | boiler |
reset | reset |
CD
2
max | max |
flue | boiler |
reset | reset |
3
max | max |
flue | boiler |
reset | reset |
CD
on
service
lockout
GREENSTAR HEATSLAVE EXTERNAL
E
on
service
lockout
GREENSTAR HEATSLAVE EXTERNAL
E
on
service
lockout
GREENSTAR HEATSLAVE EXTERNAL
E
STARTING THE APPLIANCE
Central heating:
1Open all radiator valves.
Set room thermostat to maximum. Set programmer to ON for CH.
Turn the DHW thermostat control (C) fully
Turn the CH thermostat control (D) to max.
The burner should be ON with the circulating pump. The diverter valve (E) should open to port B for CH.
Ensure all radiators are heating up evenly and balance the system to the temperature difference required across the heating flow and return relevant to the heating load.
2Set the room thermostat to minimum.
The burner and circulating pump should be off. The diverter valve (E) should return to port A for DHW (default).
Domestic hot water & central heating:
3Set the room thermostat to maximum.
Set the programmer to ON for DHW & CH. Turn the DHW thermostat control (C) fully
Set the CH thermostat control (D) to max.
The burner should be ON with the circulating pump. The diverter valve (E) should open to port B for CH.
4 Set the DHW thermostat control (C) to max. |
|
The diverter valve (E) should move to port A |
|
and divert the flow to the Heatslave tank. | COMMISSIONING |
|
4
max | max |
on
service
|
| lockout |
flue | boiler |
|
reset | reset | GREENSTAR HEATSLAVE EXTERNAL |
|
|
CD
E
34
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL