Installation Instructions
6. Installation
Securing to the wall
• | Installation must conform with all local building, water or Gas Regulations or AS5601. |
• | The weight of the device will be applied to the wall. If the strength of the wall is not suffi- |
| cient, reinforcement must be done to prevent the transfer of vibration. |
• | Do not drop or apply unnecessary force to the device when installing. Internal parts may |
Be sure to do | be damaged and may become highly dangerous. |
| |
• | Install the unit on a vertical wall and ensure that it is level. |
|
|
Item
Locating Screw Holes
Mounting
Structure
| Check | Illustration |
| CAUTION | Location of Screw Hole |
|
| |
• | When installing with bare hands, take caution to | Mounting Bracket |
| not inflict injury. | (upper) |
• | Be careful not to hit electrical wiring, gas, or water |
|
| piping while drilling holes. |
|
1. Drill a single screw hole, making sure to hit a stud.
2. Insert and tighten the screw and hang the unit by the upper wall mounting bracket.
3. Determine the positions for the remaining four screws |
|
(two for the top bracket and two for the bottom), and |
|
remove the unit. | Locating Screw Holes |
| |
4. Drill holes for the remaining four screws. | Tapping Screw |
5. Hang the unit again by the first screw, and then insert and tighten the remaining four screws.
6. Take waterproofing measures so that water does not enter the building from screws mounting the device.
•Make sure the unit is installed securely so that it will not fall or move due to vibrations or earthquakes.
8