NurseCall Relay Unit Installation | en 13
Bosch Security Systems User Manual F.01U.252.722 | V1 | 2011.12
3 Installation

3.1 Unpacking

The NurseCall Relay Unit is carefully packed for transportation.
The components contained in the box are protected, but should be handled with care.
Store the packaging material for further use (storage or transport).
1. Take all components out of the box and place the NurseCall Relay Unit on the working
space.
2. Check each component in the box, in accordance with the list of contents below.
3. Check that the NurseCall Relay Unit and its accessories have not been damaged during
transportation.
In case of defective or missing equipment, do not try to install the NurseCall Relay Unit.
Contact immediately your local representative.

3.1.1 List of contents

Description
NurseCall Relay Unit
Power supply adaptor (Europe)
230VAC/10VAC
or
Power supply adaptor (UK)
230VAC/10VAC UK
or
Power supply adaptor (US)
115VAC/10VAC
Antenna 434MHz 1/2 L=34 cm FME
Straight adapter BFME-TNC
Right angled bended adapter BFME-ETNC
2 m Cable FCC 6/4
NurseCall Relay Unit User Manual