Installation

Falcon 36 Operation Manual

If the laminator is in a crate:

1.Remove the top of the crate and then the sides in the order shown in Figure 2-4.

CAUTION

Do not allow the top to fall into the crate. It

can damage the laminator.

Do not put packing screws on the floor. They can cause problems when trying to roll the machine into position.

A second person must support the side labeled 5 in Figure 2-4. It can fall and damage the laminator.

 

1

4

5

 

SAFETY

 

INSTRUCTIONS

 

RICHTLINIENSICHERHEITS-

 

SÉCURITÉCONSIGNESDE

 

 

PO

2

3

OB

 

 

TT

 

 

MO

 

 

WARNING

 

 

 

ACHTUNG

 

 

Figure 2-4: Removing the Crate

2. Gently unwrap the shrink wrap from around the laminator.

CAUTION

Do not use a knife or other sharp instrument

during installation or while servicing the laminator. You can cause irreparable damage to the rolls.

3.Carefully remove any accessories packed with the laminator. The accessory pack should contain:

1 Set, hex wrenches

1 Slitting knife

1 Manual

1 Set, spare fuses

1 Tape measure

1 Roll of masking tape

1 Rubber cement eraser

Foot Bolt

Shipping

Pad

Figure 2-5: Removing the Packing Assemblies

4.Remove the screws holding the foot pads onto the pallet using the Phillips head screwdriver.

5.Have the laminator lifted off the skid and placed on the floor by licensed riggers. The riggers must also unscrew the foot bolts from the laminator frame since it requires lifting the laminator.

2-6

© GBC Pro-Tech 1997 October