FLAMMABLE VAPOR

IGNITION RESISTANT WATER HEATERS

Table of Contents

 

Page

Service Procedure

Introduction

3

- - -

Trouble shooting Chart

4

- - -

Inner Door Gasket Removal, Inspection, Replacement and Installation

5

RG-I

Thermocouple Testing and Replacement

8

RG-II

Pilot Assembly Inspection Cleaning and Replacement

10

RG-III

Piezo Igniter and Electrode Testing

11

RG-IV

Combination Thermostat/Gas Valve Testing and Replacement

12

RG-V

Burner Operation Inspection, Adjustment, Cleaning and Replacement

17

RG-VI

Resettable Thermal Switch Testing and Replacement

20

RG-VII

ScreenLok® Flame Arrestor Cleaning

22

RG-VIII

Dip Tube and Anode Inspection and Replacement

23

RG-IX

Generic Parts List

25

- - -

3

Page 2
Image 2
Bradford-White Corp MI50L, CX), M1XR403S*FCX, MI504S, MI60T, MI40T, MI404T, MI30T, M430T, M2XR504T, M450S, MI303T Table of Contents