Braun L955 manual Pre-Lift Operation Notes and Details

Models: L955

1 43
Download 43 pages 60.56 Kb
Page 21
Image 21

Pre-Lift Operation Notes and Details

operator must activate the DOWN switch to lower the platform fully to the ground. The lift operator or attendant must view the platform as it lowers to be certain the entire platform reaches and rests safely on the ground. Stop activating the DOWN switch if any portion of the platform is obstructed while descending or the platform does not reach ground level for any reason (contact with an obstruc- tion, mechanical failure, exceed- ing the lift “floor-to-ground” capacity, etc.).

After the platform is fully lowered (platform reaches the ground), the lift operator should continue to press the DOWN switch to

unfold the outboard roll stop and the side entry roll stop fully (ramp position). Note: The roll stops must be fully unfolded until the entire wheelchair has crossed the roll stops when loading or unloading at ground level. Discontinue lift opera- tion immediately if the roll stops or latch do not operate properly.

Bridging: The L955SE incorpo- rates a bridging feature. This feature stops the down travel of the platform if the outboard end of the platform contacts a raised surface (such as a curb), pre- venting the operator from lower- ing the inboard end of the platform.

Handrails: Dual handrails are provided for wheelchair passen- ger (or standee) use. The handrails automatically unfold to the deployed position when the platform unfolds and fold auto- matically to the stowed position when the platform folds. The passenger may choose to grip the handrails when on the lift platform (if applicable).

Note: The right (front) handrail is equipped with an UP/DOWN control switch (details in Control Switches section). Discontinue lift operation immediately if the handrails do not operate properly.

Page 19

Page 21
Image 21
Braun L955 manual Pre-Lift Operation Notes and Details