C.3 - Close off ball valve completely and
prime the open ended 36” length of clear tubing
with provided Interstitial Fluid. Use a liquid funnel.
Filling Bravo Systems Double Wall Products with Brine
(saline) solution will void the product warranty. You must use only
Barb &
Ball Valve
Assembly
Bucket
Venturi Vacuum Generator
After liquid fill, Conduct the Advanced Leak Detection Procedure, then Cut the ball valve assembly from its tubing and connect open end of tubing to Primary manometer. Also unthread the Gauge Assembly and use provided PVC threaded plug to close off open test port fitting.
C.4 - After filling the tubing all the way to the ball valve, insert open end into your liquid source. (5 gallon bucket filled with fluid is recommended.)
C.5 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system at a rate of about 2 gallons a minute.
...SLOWLY open ball valve...
C.6 - STOP PULLING VACUUM WHEN THE LIQUID IS
THE INTERSTITIAL SPACE / TEST PORT. This is easily visible while filling the DoubleWall Product.
8ii-B409-DW-10A