Bravo View B409 SLOWLY open ball valve, Filling Bravo Systems Double Wall Products with Brine

Models: B409

1 12
Download 12 pages 5.43 Kb
Page 8
Image 8
C.3 - Close off ball valve completely and

C.3 - Close off ball valve completely and

prime the open ended 36” length of clear tubing

with provided Interstitial Fluid. Use a liquid funnel.

Filling Bravo Systems Double Wall Products with Brine

(saline) solution will void the product warranty. You must use only Bravo-Supplied Interstitial Fluid, part # IMF-1GAL

Barb &

Ball Valve

Assembly

Bucket

Venturi Vacuum Generator

After liquid fill, Conduct the Advanced Leak Detection Procedure, then Cut the ball valve assembly from its tubing and connect open end of tubing to Primary manometer. Also unthread the Gauge Assembly and use provided PVC threaded plug to close off open test port fitting.

C.4 - After filling the tubing all the way to the ball valve, insert open end into your liquid source. (5 gallon bucket filled with fluid is recommended.)

C.5 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system at a rate of about 2 gallons a minute.

prime the open ended 36” length of clear tubing ...SLOWLY open ball valve...

C.6 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF

THE INTERSTITIAL SPACE / TEST PORT. This is easily visible while filling the DoubleWall Product.

8ii-B409-DW-10A

Page 8
Image 8
Bravo View B409 installation instructions SLOWLY open ball valve, Filling Bravo Systems Double Wall Products with Brine