ASSEMBLY
Figure 9. INSTALL BOOM
SUPPORTS
9a. Install the Boom Supports
(38) to the left and right side of the Rear Base Assembly (36) using 2 Lock Nuts (45), as shown.
Note: Thread lock nut close to the end of the boom support.
38
45
Whiz Lock Nut, 5/16”
Qty. 4
Note:Thread nut close to end of boom support (38).
45
45
Figure 10. INSTALL BOOM CENTER BAR & BOOM EXTENSIONS
10a. Install a Lock Nut
(45) on both Boom Sup-
ports (38) with the flange50 facing upward as shown.
10b. Position Boom Center Bar (39) over both Boom Supports (38).
Note:Once assembled completely and hooked to tractor, measure from each Boom Extension to the ground and adjust threaded nut until you get a distance of approximately 16.5 inches before spraying.
41
10c. Mount RH and LH Boom Extensions (40 &
41)to Boom Supports and tighten snugly using Knob (50).
40 39
45
38
45
Whiz Lock Nut, 5/16”
Qty. 2
11.