Broan E661 manual Prepare The Installation Cont’D, Prepare The Hood

Models: E661

1 36
Download 36 pages 44.84 Kb
Page 5
Image 5
2. PREPARE THE INSTALLATION (CONT’D)

2. PREPARE THE INSTALLATION (CONT’D)

Cut-out the openings for duct (A) and power cable (B), in cabinet or wall, according to the direction of discharge

chosen.

!

See figures below.

 

NOTE: If using the optional adaptor

3¼” x 14” to 3¼” x 10” model #T461, the duct opening width

(A on figures below) will be 10½”, centered.

HORIZONTAL DISCHARGE

VERTICAL DISCHARGE

 

C

 

 

 

L

 

 

A

 

 

 

3½”

 

 

7 8

 

 

B

2¾”

dia.

HD0121A

 

 

CABINET BOTTOM

 

 

 

 

C

 

 

 

 

L

 

 

 

A

1½’’

 

 

4¼’’

8’’

2’’

 

 

 

 

 

 

 

7¼’’

7¼’’

B

2’’

 

 

HD0120A

7/8’’

 

 

 

3. PREPARE THE HOOD

3.1Pull latch tabs and remove filters from the hood.

HD0107

3.2Remove the 5 screws retaining the bottom panel to the hood and set aside. Pull out the bottom panel.

HO0030

3.3Punch out the appropriate electrical knock-out hole.

3. PREPARE THE HOOD SCREW LOCATIONS

- 5 -

Page 5
Image 5
Broan E661 manual Prepare The Installation Cont’D, Prepare The Hood