Broan L300KMG warranty Typical Installation, Mounting New Frame Construction, Wiring

Models: L300KMG

1 12
Download 12 pages 6.09 Kb
Page 2
Image 2

MODEL • L300KMG

TYPICAL INSTALLATION

MOUNTING (New Frame Construction)

8” ROUND DUCT

Mounting brackets

 

 

factory-shipped in

 

position for ½”

 

ceiling material.

ADDITIONAL

 

1½” FRAMING

CEILING JOIST

 

(16” centers shown)

Blower factory-shipped

MOUNTING

in horizontal

SCREW

discharge position.

 

GRILLE

 

Install after

 

ceiling is

 

finished.

GRILLE

 

 

SCREW

Factory-shipped unit installed in new construction.

Page 2

TYPICAL INSTALLATION

WIRING

BLACK

TO

BLACKTOP / BACK

OF HOUSING

GROUND TO

WIRING PLATE

WIRING

PLATE

WHITE

TO

WHITE

120 VAC LINE IN

Ventilator can be wired from outside of housing.

Use UL approved connectors to wire per local codes.

DUCTING (Horizontal blower discharge)

MOUNTING (Existing Frame Construction)

2 X 4 FRAMING

(wide side down)

8” ROUND DUCT

CEILING JOIST

(16” centers

shown)

MOUNTING

BRACKETS

ROOF CAP

8”

ROUND

DUCT

8”

ROUND ELBOW

WALL

CAP

(Attached to

FINISHED

opposite sides

CEILING

of housing &

MATERIAL

upside-down,

 

so housing is

 

flush with

 

finished ceiling)

 

GRILLE

GRILLE

 

SCREW

Factory-shipped unit installed in existing construction.

Two ways to connect ductwork to a factory-shipped unit.

IMPORTANT:

Remove shipping tape from damper

Remove the shipping tape from the damper flap and make sure that damper flap opens and closes freely inside the ductwork. Use duct tape to make ductwork connections secure and air-tight.

Remove shipping ring from blower inlet

Remove the shipping ring from the blower inlet before operating the ventilator.

Page 2
Image 2
Broan L300KMG warranty Typical Installation, Mounting New Frame Construction, Wiring, Remove shipping tape from damper