Broan RM524204, RM523004 manual Install The, Hood, opening on the back of the hood with the

Models: RM524204 RM523004

1 40
Download 40 pages 51.49 Kb
Page 9
Image 9
INSTALL THE

INSTALL THE

 

 

 

 

 

 

 

 

 

LEVEL

MOUNTING

WALL FRAMING

HOOD

 

 

 

SCREWS

 

SCREWS

 

 

 

(3.9x9.5mm)

(4.8x38mm)

 

 

Note: at least two people

MOUNTING

 

 

 

 

 

will be required to mount

 

 

 

 

 

SCREWS

 

 

 

 

 

the hood.

 

 

 

 

 

 

 

 

 

(4.8x38mm)

 

 

 

 

 

1. Raise

the hood into its

 

 

 

 

MOUNTING

 

 

 

 

BRACKET

mounting position.

 

 

 

 

 

 

2. Plug the power cord into

 

 

 

 

 

 

the

electric

wall

 

 

 

 

RECTANGULAR

receptacle.

Tuck

 

 

 

 

CUTOUT

excess cord behind the

 

 

 

 

 

 

flue.

 

 

 

 

 

 

 

 

 

3. Align

the rectangular

 

 

 

 

 

FIG. 9

 

 

 

 

 

 

opening on the back of the hood with the

 

 

 

 

wall-mounting bracket. Gently lower the

 

3.9x9.5mm

ELECTRICAL

hood until it securely engages the bracket.

 

 

SYSTEM

 

SCREWS

Fig. 9

 

 

 

 

 

 

PLATE

 

 

 

 

 

 

 

4.

Level the hood with (2) screws

 

 

(3.9x9.5mm) and secure with (4)

 

 

mounting screws (4.8x38mm). Use

 

 

drywall anchors provided if wall studs or

 

 

framing are not available. Fig. 9

 

5.

Secure the electrical system plate to the

 

 

range hood with (2) mounting screws

 

 

(3.9x9.5mm). Fig. 10

 

6.

Raise the upper flue until its holes align

 

 

with holes in the flue mounting bracket

 

 

(located on ceiling). Fig. 11

 

7.

Secure the flue with (2) mounting screws

FIG.10

 

(3.9x9.5mm). Fig. 11

 

 

 

3.9x9.5mm

 

 

MOUNTING SCREWS

 

 

FIG.11

- 9 -

Page 9
Image 9
Broan RM524204 Install The, Hood, opening on the back of the hood with the, hood until it securely engages the bracket