![](/images/new-backgrounds/1047958/47958103x1.webp)
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION |
|
MODEL NO.: _________________________________ | SERIAL NO.:________________________________________ |
DATE:________________________________________ | TECHNICIAN: ______________________________________ |
II.
VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
CHECK GAS PIPING FOR LEAKS
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III.START-UP
ELECTRICAL |
|
|
|
|
|
|
|
|
|
SUPPLY VOLTAGE |
|
|
|
| |||||
COMPRESSOR AMPS | L1 |
|
| L2 |
|
| L3 | ||
L1 |
|
| L2 |
|
| L3 | |||
TEMPERATURES |
|
|
|
|
|
|
|
|
|
|
|
| DB |
|
|
| |||
|
|
| DB |
|
|
| WB | ||
COOLING SUPPLY AIR |
|
|
|
| DB |
|
|
| |
GAS HEAT SUPPLY AIR |
|
|
|
| DB |
|
|
|
PRESSURES |
|
|
GAS INLET PRESSURE |
| IN. WG |
GAS MANIFOLD PRESSURE |
| IN. WG |
REFRIGERANT SUCTION |
| PSIG |
REFRIGERANT DISCHARGE |
| PSIG |
VERIFY REFRIGERANT CHARGE USING CHARGING TABLES
VERIFY THAT
CUT ALONG DOTTED LINE
CUT ALONG DOTTED LINE
Copyright 2005 Bryant Heating & Cooling Systems | Printed in U.S.A. | CATALOG NO. |