Bunn 14 manual Plumbing Requirements, Plumbing Hook-Up

Models: 14

1 17
Download 17 pages 3.34 Kb
Page 7
Image 7
PLUMBING REQUIREMENTS

PLUMBING REQUIREMENTS

This dispenser must be connected to a cold water system with operating pressure between 20 and 90 psi from a 1⁄2” or larger supply line. A shut-off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 90 psi to reduce it to 50 psi. The water inlet fitting is 1⁄4” flare.

NOTE - Bunn-O-Matic recommends 1⁄4” copper tubing for installations of less than 25 feet and 3⁄8” for more than 25 feet from the 1⁄2” water supply line. At least 18 inches of an FDA approved fexible beverage tubing, such as reinforced braided polyethylene or silicone, before the dispenser will facilitate movement to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the dispenser. The size and shape of the hole made in the supply line by this type of device may restrict water fow.

NOTE - If a backfow preventer is required by code, a shock arrestor should be installed between backfow preventer and dispenser. Installing the shock arrestor as close to the dispenser as possible will provide the best results.

This equipment must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply with the applicable Plumbing/Sanitation Code for your area.

PLUMBING HOOK-UP

1.Flush the water line and securely attach it to the elbow fitting on the bottom of the dispenser.

2.Turn-on the water supply.

NOTE - Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.

7

45304.1 090611

 

Page 7
Image 7
Bunn 14 manual Plumbing Requirements, Plumbing Hook-Up