INITIAL SET-UP
CAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions.
1. Insert an empty funnel into the funnel rails of one of the brew stations.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Make sure the corresponding ON/OFF switch is ON (LED will be lit).
4. Water will flow into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT...TANK FILLING until tank is filled with water.
5. Wait approximately
NOTE: Brew water temperature is factory set at 205° F (96.1° C). Refer to TEMPERATURE SELECTION below should the water temperature need to be increased or decreased. When brew water temperature is changed, ready temperature will need to be increased or decreased also.
6.Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refilling.
7.Water volumes and flow settings have been preset at the factory. Refer to adjustments for the Set Brew Volumes or Calibrate Flow section of the Programming Manual on the
8.The brewer is now ready for use in accordance with the instructions for Coffee Brewing.
TEMPERATURE SELECTION
SET TEMP - Range: 185˚F (85˚C) to 205˚F (96˚C)
This function allows the operator to set the brew water temperature in the tank. It also sets the hot water faucet dispense temperature.
SET TEMP: XXX° (-) DONE (+)
Procedure for setting the Set Temp:
1.Press and hold the right hidden switch until the display reads SET LANGUAGE. Press and release the right hidden switch until the display reads SET TEMP: XXX°.
2.Using
3.When finished, press DONE to save the new setting and to advance to the next function screen, READY TEMP: XXX°. Press and release the ON/OFF switch (either on DUAL brewers) to exit programming and return to the MAIN SCREEN.
Page 7 | 440119 010412 |
|