Bunn AF PR-3 A. Main Power On/Off, B. Refill Circuit On/Off, C. Probe Control Box Low/Off/High

Models: AF PR-3

1 17
Download 17 pages 13.04 Kb
Page 5
Image 5
OPERATING CONTROLS

OPERATING CONTROLS

B

A

P2052

A. MAIN POWER ON/OFF

The main power ON/OFF switch is located on the right of the front panel just above the power cord.

B. REFILL CIRCUIT ON/OFF

The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch. These allow each circuit to operate independently of the other.

C. PROBE CONTROL BOX LOW/OFF/HIGH

On models equipped with a dual level probe, there is a LOW/OFF/HIGH switch located at the probe control box on the hopper. The “OFF” position allows the operator to disable the probe for that hopper only. THE “LOW” and “HIGH” positions allow the operator to select the level of product desired for that hopper.

C

P1951

5

28791.1 011500

 

Page 5
Image 5
Bunn AF PR-3 A. Main Power On/Off, B. Refill Circuit On/Off, C. Probe Control Box Low/Off/High, Operating Controls