SERVICE

This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.

WARNING - Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel. The brewer should be unplugged when servicing, except when electrical tests are required and the test procedure specifically states to plug in the brewer.

COMPONENT ACCESS

WARNING - Disconnect the brewer from the power source before the removal of any panel or the replacement of any component.

All components are accessible by the removal of the top cover or warmer housing, front access panel and warmer plate(s).

The top cover is attached with one #4-40 screw.

The front access panel is attached with four #6-32 screws.

Each warmer assembly is attached with three #4- 40 screws.

Contents

 

Control Board ....................................................

22

Switch Panel ......................................................

23

Dispense Valve ..................................................

24

Limit Thermostat ...............................................

25

Tank Heaters ......................................................

26

Voltage Selector Switch .....................................

28

Refill Valve .........................................................

29

Warmer Elements ..............................................

30

Wiring Diagrams ...............................................

31

Page 21

N

 

 

 

 

 

E

 

 

 

 

CA

 

 

 

 

 

 

R

 

ONTE

NTS

 

RIS

KS IN

EL CHOT

TO CO

MPLY

 

 

FUNNARE

URE

 

 

 

FAIL

 

 

 

 

E A D R IS :

!

P1889

FIG. 1 COMPONENT ACCESS

29707.1 082803