Bunn ES.1AF Site Requirements, Physical, Adjustable Legs, Plumbing, Electrical, BUNNEspress

Models: ES.1AF

1 12
Download 12 pages 36.83 Kb
Page 4
Image 4
SITE REQUIREMENTS

BUNNEspress®

SITE REQUIREMENTS

Model ES•1AF

PHYSICAL

The brewer is for indoor use only on a sturdy counter or cart. It is 16” (40.5 cm) wide, 20” (50.8 cm) tall and 19.25” (48.9 cm) deep. The brewer weighs approximately 88 pounds (40 kg) with the water tank filled.

ADJUSTABLE LEGS

Remove the four rubber feet from the brewer and install the four 4” adjustable legs supplied with the brewer. Place the brewer on a counter or cart having sufficient space for easy access to water, electricity and drainage.

PLUMBING

The brewer must be connected to a cold water source with operating pressure between 20 and 90 psi (1.5-6.5 bar) from a .5” or larger supply line. Install a shutoff valve in the water line before the brewer. Install a regulator before the brewer when the pressure is greater than 90 psi (6.3 bar) to reduce it to 45-60 psi ( 3-4 bar). The enclosed water strainer, water inlet hose assembly and drain hose must be installed.

NOTE-Only softened or demineralized water should be used in this espresso brewer to reduce the service problems caused by naturally occurring elements in your local water supply. A polyphosphate feeder is not recommended because it does not remove minerals.

NOTE-Bunn-O-Matic recommends .375” copper tubing for no more than 25 feet from the .5” water supply line. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

ELECTRICAL

The brewer is equipped with an attached cordset and requires a 2-wire, grounded mating receptacle rated 120 volts ac, 20 amp, single phase, 60 hz. An electrician must properly install a NEMA 5-20R connector to the appropriate electrical service on an individual branch circuit to install this brewer.

CAUTION- The brewer must be properly grounded. A plumbing line will not provide an adequate ground.

FROTHER DISCONNECT ASSEMBLY

When installing frother assembly thoroughly wet O-rings with water. Using the slide bracket on the front panel as a guide, slide frother assembly into the frother manifold as far as it will go. Secure frother assembly with attached thumb screw.

 

 

 

 

 

 

 

cle

an

 

 

 

 

 

g w

ith

 

 

 

 

 

et

o-rin

in

 

 

 

 

st w

 

re

 

 

 

Mu

 

befo

 

 

N

 

ter

 

 

 

wa

 

 

CA

UT

IO

 

 

 

 

 

 

 

 

 

 

 

 

 

HOT-Surfaces

 

 

 

 

-Steam

 

 

 

 

 

Liquid

 

 

 

 

P911

4

Page 4
Image 4
Bunn ES.1AF Site Requirements, Physical, Adjustable Legs, Plumbing, Electrical, Frother Disconnect Assembly, BUNNEspress