BUNN Espress ®
INSTALLATION
ES•2C™
PLUMBING
Install the brewer as indicated below
FROM
WATER
SUPPLY
WATER STRAINER
ASSY.
INLET HOSE
24682.0000 |
|
|
|
| ||
| Adaptor |
| 24684.0000 |
| 23820.0000 | |
|
|
| ||||
|
|
| Strainer Assy. | |||
|
|
| Sealing Washer | |||
|
|
|
|
|
From Water Treatment |
|
BUNN | FLOW |
90psigmaxoperatingpressure | |
BOMStrainer |
|
24684.0000
Sealing Washer
24683.0000
Adapter
To Espresso Brewer |
Inlet Hose |
ELECTRICAL
1.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
2.When instructed to proceed, connect the brewer to the power source.
INITIAL FILL & HEAT
1.Watch the tank water level gage and push the tank/boiler manual fill button. Hold the button until the water level is visible in the sight gage.
2.Connect the brewer to the power source.
3.Place the main power switch in the “ON” position. The automatic refill function of the electronic control system will engage at this time. The refill indicator will glow and the tank will automatically fill with water. This switch also initiates the heating of the water in the tank/boiler.
4.Press the continuous flow button on each of the group control panels just until water flows from the group heads. This will purge air from the lines and allow faster heating of the group heads.
5