INITIAL FILL

CAUTION: The dispenser must be disconnected from the power source throughout the initial fill except when specified in the instructions.

1.Remove drip tray assembly and splash panel from the dispenser.

2.Pull the overflow tube from its retaining clip and place the end into an empty 64 fluid ounce (2 liter) container.

3.Ensure that the Main Water Valve and the Water Bath Valve Fig 4, are turned off (handles positioned at 6 o’clock and 12 o’clock, respectively,) and that the Refrigeration Switch Fig 3, is in the OFF (rear) position.

4.Turn on the water supply.

5.While observing the water bath sight gauge (the clear tube located just to the left of the plumbing connections,) begin filling the water bath by rotating the handle of the Water Bath Valve counterclockwise to the 9 o’clock position.

6.When the water level in the sight gauge comes within 1 inch (25.4 mm) of the clear plastic tee, reduce the water flow by rotating the handle of the Water Bath Valve clockwise to the 11 o’clock position.

7.When the water in the water bath sight gauge begins to trickle down into the drip tray, turn the Water Bath Valve off by rotating the handle clockwise to the 12 o’clock position.

8.Connect the dispenser to the power source.

9.After approximately 3 minutes (this allows the recirculating pump and cabinet cooling components an opportunity to fill with water,) top off the water bath tank by rotating the handle of the Water Bath Valve counterclockwise to the 11 o’clock position.

10.Again, when the water in the water bath sight gauge begins to trickle down into the drip tray, turn the Water Bath Valve off by rotating the handle clockwise to the 12 o’clock position.

11.Place the Refrigeration Switch ON (forward.)

12.It will take approximately 4 hours at 70 degrees F (21 degrees C) ambient to create the ice bank required for full dispenser performance. During this time, some further trickling from the water bath is expected due to expansion caused by ice bank formation. While the refrigeration system is creating the ice bank, the dispenser may be readied for use as described in Loading, Priming and Adjustment.

13.The dispenser will safely store concentrate once the “COOLING” indicator completely extinguishes (not lit steadily or flashing.)

14.After the refrigeration compressor switches off, turn Main Water Valve on by rotating the handle counterclock- wise to the 3 o’clock position. Secure the overflow tube into its retaining clip and replace the splash panel and drip tray assembly.

LOADING

Frozen Concentrates

1.Thaw the frozen concentrate in a refrigerated 35-40 degrees F (1.6-4.4 degrees C) environment for 36 to 48 hours before use.

2.Thoroughly mix the thawed concentrate by vigorously shaking the product container.

3.Open the dispenser door.

4.Prior to placing the product container in the dispenser, make sure that the o-ring on the container adapter is lubricated. This will ease removal of the container when it becomes necessary.

5.Place the product container in the desired position and press it firmly into the bottle adapter opening.

6.Open the vent hole in the product container.

Note: Concentrate in the container must be completely thawed and be within the temperature range of 35-40 degrees F (1.6-4.4 degrees C.) Product outside of this temperature range, especially below, will produce an “out of brix” drink.

8

33496 011101

 

Page 8
Image 8
Bunn FCD-4 manual Initial Fill, Loading, Frozen Concentrates

FCD-4 specifications

The Bunn FCD-4 is a commercial coffee dispenser designed to meet the demands of busy environments such as cafes, restaurants, and catering businesses. Known for its durability and performance, the FCD-4 has become a popular choice among coffee service operators.

One of the main features of the Bunn FCD-4 is its ability to hold and dispense up to four different flavors of coffee, allowing businesses to cater to diverse customer preferences. This multifunctionality is critical in settings where customers appreciate variety. With its 4.0-gallon capacity, the FCD-4 is engineered to handle high-volume service while maintaining consistent temperature and fresh taste.

The FCD-4 utilizes Bunn's well-known brewing technology. It is designed with an innovative brew sequence that optimizes coffee extraction, ensuring rich flavor profiles and maximum aroma retention. This technology, coupled with its ability to brew directly into multiple containers, provides operators with versatility and efficiency in serving coffee.

Another characteristic of the FCD-4 is its easy-to-read digital display that shows the current status of the coffee dispenser, including brew levels and operational readiness. This feature enables staff to monitor the workflow seamlessly, reducing wait times for customers.

The Bunn FCD-4 also stands out because of its user-friendly design. It includes ergonomic controls for straightforward operation, making it accessible to users with varying degrees of experience. Moreover, it is equipped with a self-cleaning function that simplifies maintenance, ensuring that the dispenser remains hygienic and operational with minimal downtime.

Durability is a hallmark of Bunn products, and the FCD-4 is no exception. Constructed with high-quality stainless steel, it is built to withstand the rigors of daily use in high-demand environments. The design also includes safety features such as automatic shut-off and temperature controls to prevent overheating, enhancing user safety.

In summary, the Bunn FCD-4 is a versatile and robust coffee dispenser that caters to the needs of commercial environments. Its capacity to hold multiple coffee flavors, advanced brewing technology, user-friendly controls, and durable construction make it a top choice for businesses aiming to deliver high-quality coffee consistently. Whether serving coffee at a busy café or during a large event, the Bunn FCD-4 is designed to enhance the coffee-serving experience.