Bunn JDF-2N Loading, Priming, Plumbing Hookup, Frozen Concentrates, Ambient Concentrates Optional

Models: JDF-2N

1 32
Download 32 pages 63.63 Kb
Page 6
Image 6
PLUMBING HOOKUP

PLUMBING HOOKUP

All plumbing connections are located on the rear of the dispenser. For Models prior to the Water Inlet Valve, both the rinse and potable water line must be connected to a water source.

 

 

P3805

 

P2656

 

Models w/Water Inlet Valve

Prior to Models w/Water Inlet Valve

 

 

 

 

 

 

FIG 2 Plumbing Connections

 

LOADING

 

 

 

 

 

 

Frozen Concentrates

1.Thaw the frozen concentrate in a refrigerated 35-40 degrees F (1.6-4.4 degrees C) environment for 36 to 48 hours before use.

2.Thoroughly mix the thawed concentrate by vigorously shaking the product container.

3.Open the dispenser door.

4.Prior to placing the product container in the dispenser, make sure that the o-ring on the container adapter is lubricated. This will ease removal of the container when it becomes necessary.

5.Place the product container in the desired position and press it firmly into the bottle adapter opening.

6.Open the vent hole in the product container.

Note: Concentrate in the container must be completely thawed and be within the temperature range of 35-40 degrees F (1.6-4.4 degrees C.) Product outside of this temperature range, especially below, will produce an “out of brix” drink.

Ambient Concentrates (Optional)

1.Install an Ambient Concentrate Conversion Kit (BUNN-O-MATIC part number 33699.0001) per the instruc- tions provided in the kit.

2.Attach the concentrate product hose to the appropriate concentrate line located at the rear of the dispens- er.

3.Attach the other end of the product hose to the product container through an appropriate fitting.

PRIMING

1.Open the dispenser door

2.Load concentrate per instructions in section titled Loading.

3.Close the dispenser door. NOTE: The dispenser will not operate with the door open.

4.Place a large container under the appropriate dispense nozzle.

5.Dispensers with Press and Hold Feature:

Press and hold the “Product Dispense Switch” Fig 4, until concentrate dispenses from the dispense nozzle.

Dispensers with Portion Control Feature:

Press and hold the “+/STOP Switch” Fig 5, until concentrate dispenses from the dispense nozzle. Note: This may take several seconds, depending on the installation and programmed pump speed.

38310 012207

Page 6
Image 6
Bunn JDF-2N manual Loading, Priming, Plumbing Hookup, Frozen Concentrates, Ambient Concentrates Optional