Bunn Smart Wave Silver Series, Smart Wave Series manual Plumbing Requirements, Plumbing Hook-Up

Models: Smart Wave Silver Series Smart Wave Series

1 20
Download 20 pages 16.9 Kb
Page 5
Image 5
PLUMBING REQUIREMENTS

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a 12" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14" flare. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized water supply to this equipment.

NOTE - Bunn-O-Matic recommends 14" copper tubing for installations of less than 25 feet and 38" for more than 25 feet from the 12" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Adminis-tration (FDA). For models installed outside the U.S.A., comply with the applicable Plumbing /SanitationCode.

Plumbing Hook-Up

1.Flush the water line.

2.Securely attach the Strainer/Flow Control and tube assembly to the water supply line.

3.Securely attach tube assembly to the flare fitting at the rear of the brewer.

4.Turn on the water supply.

FIG 3

Page 5

40410

022908

 

Page 5
Image 5
Bunn Smart Wave Silver Series, Smart Wave Series manual Plumbing Requirements, Plumbing Hook-Up