RECOMMENDED DAILY CLEANING (Continued)
1.Install the seal(s) over the 2. Align the auger shaft(s) with the
flange at the rear of the cooling | auger(s). Push the auger(s) as |
drum(s) and press the seal(s) | far as they will go and rotate so |
firmly into place as shown. | the flat face of the auger shaft |
| is aligned with the flat face of |
| the auger nose. |
4.Thoroughly rinse the hopper(s) 5. Slide into place and push down
and install over the auger(s) | until the hopper lock plunger(s) |
and cooling drum(s). | snap into place. |
3.Install auger nose bushing into inside front of hopper.
6.Set the lids on the hopper(s) and plug in the hopper lid lamp cord(s).
7.Position the faucet seal and re- turn spring in the faucet valve.
8.Slide the faucet valve assembly 9. Press down on the valve to
into place on the hopper. | compress the spring. Position |
| the faucet handle over the fau- |
| cet valve one side at a time and |
| snap into place on the hopper. |
10.Assemble the drip tray.
9 | 41084 102709 |
|