![sembly.](/images/new-backgrounds/63129/6312923x1.webp)
SERVICE (cont.) |
| 4. | Remove sprayhead and the hex nut securing the | |||
TANK HEATER |
|
|
| sprayhead tube to the hood. Set aside for reas- | ||
|
|
| sembly. |
| ||
|
|
|
|
| ||
|
|
| 5. | Remove the eight | ||
|
|
|
| to the tank. |
| |
|
|
| 6. | Remove the tank lid with sprayhead tube and tank | ||
|
|
|
| heater. |
| |
|
|
| 7 | Remove the two hex nuts securing the tank heater | ||
|
|
|
| to the tank lid. Remove tank heater with gaskets | ||
|
|
|
| and discard. |
| |
|
|
| 8. | Install new tank heater with gaskets on the tank lid | ||
|
|
|
| and secure with two hex nuts. | ||
| FIG. 6 TANK HEATER | P1262 | 9. | Install tank lid with sprayhead tube and tank heater | ||
|
| using eight |
| |||
Location: |
|
|
| |||
|
| 10. | Secure sprayhead tube to hood using a hex nut. | |||
The tank heater is located inside the tank and | ||||||
11. | Install sprayhead. |
| ||||
secured to the tank lid. |
|
| ||||
| 12. | Reconnect the thermal | ||||
|
|
| ||||
Test Procedures: |
|
| terminals. |
| ||
| 13. | Slide the grommet to the line 4.5" above the | ||||
1. Disconnect the brewer from the power supply. | ||||||
| capillary bulb. |
| ||||
2. With a voltmeter, check the voltage across the |
|
| ||||
14. | Insert the capillary bulb through the hole in the | |||||
black and red wire. Connect the brew to the power | ||||||
| tank lid and press the grommet firmly and evenly | |||||
source. The indication must be 220 to 240 volts |
| |||||
| so that the groove in the grommet fits into the tank | |||||
ac. |
|
|
| |||
|
|
| lid. |
| ||
3. Disconnect the brewer from the power source. |
|
| ||||
15. | Carefully bend the capillary tube so that the tube | |||||
If voltage is present as described, proceed to #4 |
| |||||
|
| and bulb inside the tank are in the vertical position. | ||||
If voltage is not present as described, refer to the |
| |||||
NOTE - The capillary tube must be clear of any electri- | ||||||
Wiring Diagrams and check wiring harness. |
| |||||
| cal termination and not kinked. |
| ||||
|
|
|
| |||
4. Disconnect the thermal | 16. | Install fill basin, secure with tank inlet fitting and | ||||
| gasket. |
| ||||
heater terminals. |
|
|
| |||
| 17. | Refer to Fig.7 when reconnecting the tank heater | ||||
5. Check for continuity across the tank heater termi- | ||||||
| wires. |
| ||||
nals. |
|
|
|
| ||
|
|
|
|
| ||
If continuity is present as described, reconnect the |
|
| Thermal | |||
thermal | Thermal | |||||
Lead on Ready Light | ||||||
If continuity is not present as described, replace the | Lead from Tank | |||||
Harness | ||||||
tank heater. |
|
| Warmer Blanket | |||
|
|
| ||||
NOTE- If the tank heater remains unable to heat, |
|
|
| |||
remove and inspect heater for cracks in the sheath. |
|
|
|
Removal and Replacement:
1.Remove the tank inlet fitting securing the fill basin to the tank lid, remove fill basin and tank inlet gasket. Set all three parts aside for reassembly.
2.Disconnect the thermal
3.Remove the thermostat capillary bulb by firmly
pulling up on the capillary at the tank lid. This will |
|
|
| P1163 | |
FIG. 7 TANK HEATER TERMINALS |
| ||||
disengage the grommet from the tank lid. |
|
| |||
10860.1 | 071598 | ||||
Page 12 | |||||
|
|
|