Burnham 53A, AL-26A, 79A, 40A manual Cold Water Supply Piping

Models: 40A 79A AL-26A

1 22
Download 22 pages 45 Kb
Page 9
Image 9
Figure 2: Cold Water Supply Piping

4.Purge air from domestic water system. Allow water to run so the tank is thoroughly purged of any debris. Run water long enough so that a minimum of five (5) volume changes of the tank are accomplished. Close faucets. Reinstall screens.

5.Check system for leaks. Repair as necessary.

F. Connect water boiler return piping (See Figures 3 thru 6).

(For connection to a steam boiler skip ahead to H on page 12).

1.Determine where in the boiler and space heating piping system the Alliance™ connections should be made by identifying the type of system from Figures 3 thru 6.

2.In all cases, the Alliance™ connection labeled "BOILER RETURN" should be piped to the boiler return piping as close to the boiler as possible and especially after any flow control or check valves in the space heating return piping. The use of a union and a shut-off valve is recommended. The use of a flow control or check valve is required to prevent back flow through the water heater during operation of the space heating system.

Figure 2: Cold Water Supply Piping

9

Page 9
Image 9
Burnham 53A, AL-26A, 79A, 40A manual Cold Water Supply Piping