Burnham RSA manual Installation of Boiler Controls, Burner Mounting

Models: RSA

1 52
Download 52 pages 34.98 Kb
Page 10
Image 10

2.Bend jacket according to Figure 28. Starting from the front, wrap the jacket around the boiler. Make sure that return pipe, observation port and shell extension fit proper into there corresponding clearance holes. Continue bending jacket around until front panels meet.

3.Attach jacket to boiler assembly with provided screws at appropriate locations. Make sure that the jacket is at least ½” to ¾” off of the floor before attaching.

4.Attach top panel with provided screws.

D. INSTALLATION OF BOILER CONTROLS

1.Install provided pressure/temperature gauge and immersion well into appropriate holes on tankless heater coil plate. Tighten so not to have any water leaks.

2.Mount the aquastat control onto the immersion well. Wire the control according to Figure 13 or 14, in the Electrical and Sequence of Operation Section.

3.Mount burner on Base front panel and wire according to instructions provided with the burner. Refer to Figure 5.

Figure 5: Burner Mounting

10

Page 10
Image 10
Burnham RSA manual Installation of Boiler Controls, Burner Mounting