Bush Hog 1145 manual Operation, Loading From A Bank

Models: 1145

1 100
Download 100 pages 29.23 Kb
Page 69
Image 69
LOADING FROM A BANK

OPERATION

LOADING FROM A BANK

Choose a forward gear that provides sufficient ground speed for loading.

Exercise caution when undercutting high banks. Dirt slides can be dangerous. Load from as low as possible for maximum efficiency. Loader lift and breakaway capacity diminish as loading height is increased.

Side cutting is a good technique for cutting down a big pile.

If the pile sides are too high and liable to cause cave-in, use loader to break down the sides until a slot can be cut over the top.

1145 01/11

Operation Section 4-29

© 2011 Alamo Group Inc.

OPERATION

Page 69
Image 69
Bush Hog 1145 manual Operation, Loading From A Bank