Bush Hog 1145 manual Operation, Backfilling

Models: 1145

1 100
Download 100 pages 29.23 Kb
Page 73
Image 73
BACKFILLING

OPERATION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make it more difficult to hold a level grade.

Do not use bucket in dumped position for bulldozing. This method, shown above, will impose severe shock loadings on dump linkage, bucket cylinder and tractor.

1145 01/11

Operation Section 4-33

© 2011 Alamo Group Inc.

OPERATION

Page 73
Image 73
Bush Hog 1145 manual Operation, Backfilling